I really cannot stand it when I don't update my blog AT LEAST weekly so I thought I would just do a quick house update post. So no cute stories or pictures this time around. Just a little venting to help with my stress management!
So we had our FINAL electrical inspection this morning. Guess what? We didn't pass. No big surprise there. It took a couple times for the rough in electrical inspection as well. The thing I like is he tells you exactly what is wrong so if you fix those items, you know you will pass the next time.
We had two plugs in the garage that had to be changed to a GFI (not sure I have the terminology right) and then a portion of the concrete from the driveway was covering a portion of something important outside, so that had to be cut back. Those aren't a big deal at all and in fact, the concrete people have already been by to fix that for us.
Here is the
INSANE part of the inspection. We have to change out
ALL of the outlets in the entire house. There are 121 of those suckers. Why you may ask? Well, apparently, in the last 2 months, they implemented a new law that requires every outlet to be child tamper resistant. SERIOUSLY. Doesn't this guy know we don't give a crap about our child's safety?!?!
We don't have to change out any of the light switches - just the 121 outlets!!! I actually took the news better than I thought I would. Jeremy said he literally had to sit down when the man told him that. That is not only time consuming but we are imagining that these "special child resistant" outlets probably cost more than a basic outlet. I am just so glad I wasn't there when the guy told him that. Of course, maybe an overly emotional pregnant woman would have been able to persuade him to give us a break but I doubt it. Fortunately, our electrician was already at Inline Lighting (one of my homes away from home) and was working on getting all of those special little outlets that the state of TN has decided to require.
Of course the Inspector only does inspections on Tuesdays and Thursdays so now we have to wait until Tuesday to get another inspection. And we will have to go back to the utility place to pay another inspection fee and get on his little schedule. Although I am sure we will need all that time to swap out all those outlets. So much for seeing Jeremy at all the next few evenings.
Even though we have encountered this delay, I am still hoping against everything that we can move in by Halloween weekend. The final electrical is literally the last thing we are waiting on. The paint is finished, the appliances are in, the heating & air guys finally finished, our propane tank was put in the ground and filled, the house has even already been cleaned. And she still owes us 2 hours so I can have her come back and clean the toilets since all the nasty workmen have been using ours instead of the porta-potty that is right outside. We even have some furniture deliveries scheduled for next week.
Actually, and you know it
pains me to say this, we HAVE to be out by the 31st because we promised the Simple Life owner that we would be. Our original agreement was for us to stay through September so we are already a month over. So Jeremy can sleep in his office and Wy and I can stay a few nights with my parents if it comes to that. (Right, mom and dad?) Our stuff is getting out of here next week, even if it just goes to the garage. And THAT image my dear friends, of us being free of the Simple Life, makes me smile. I may even do a special Simple Life edition blog complete with PICTURES of our humble abode we have lived in for the past 7 months!
Please, please, please say a prayer that we get everything done before next Tuesday so that we get the green light. I am thinking about sending this guy some flowers - no, I think beer would be a better gift for an electrical inspector...lots and lots of beer!